HTS Heading 0910

Ginger, saffron, turmeric (curcuma), thyme, bay leaves, curry and other spices

All 14 HTS codes under heading 0910 (ginger, saffron), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.8%, some per unit.

Every line of heading 0910

  • 0910 Ginger, saffron, turmeric (curcuma), thyme, bay leaves, curry and other spices.
  • 0910.11.00 Neither crushed nor ground (under: Ginger): General Free; Special none; Column 2 Free.
  • 0910.11.00.10 Certified organic (under: Neither crushed nor ground) (kg).
  • 0910.11.00.15 Other (under: Neither crushed nor ground) (kg).
  • 0910.12.00.00 Crushed or ground (under: Ginger) (kg): General 1¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
  • 0910.20.00.00 Saffron (under: Ginger, saffron, turmeric (curcuma), thyme, bay leaves, curry and other spices) (kg): General Free; Special none; Column 2 Free.
  • 0910.30.00.00 Turmeric (curcuma) (under: Ginger, saffron, turmeric (curcuma), thyme, bay leaves, curry and other spices) (kg): General Free; Special none; Column 2 Free.
  • 0910.91.00.00 Mixtures referred to in note 1(b) to this chapter (kg): General 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0910.99 Other (under: Other spices).
  • 0910.99.05.00 Crude or not manufactured (under: Thyme; bay leaves) (kg): General Free; Special none; Column 2 Free.
  • 0910.99.06.00 Thyme (under: Other) (kg): General 4.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0910.99.07.00 Bay leaves (under: Other) (kg): General 3.2%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 25%.
  • 0910.99.10.00 Curry (under: Other) (kg): General Free; Special none; Column 2 11¢/kg.
  • 0910.99.20.00 Crude or not manufactured (under: Origanum (Lippia spp.)) (kg): General Free; Special none; Column 2 Free.
  • 0910.99.40.00 Other (under: Origanum (Lippia spp.)) (kg): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0910.99.50.00 Dill (under: Other) (kg): General Free; Special none; Column 2 25%.
  • 0910.99.60.00 Other (under: Other) (kg): General 1.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.