HTS Heading 1005

Corn (maize)

All 6 HTS codes under heading 1005 (corn (maize)), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 1005

  • 1005 Corn (maize).
  • 1005.10.00 Seed (under: Corn (maize)): General Free; Special none; Column 2 0.98¢/kg.
  • 1005.10.00.10 Yellow corn (under: Seed) (kg).
  • 1005.10.00.90 Other (under: Seed) (kg).
  • 1005.90 Other (under: Corn (maize)).
  • 1005.90.20 Yellow dent corn (under: Other): General 0.05¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 0.98¢/kg.
  • 1005.90.20.15 Certified Organic (under: Yellow dent corn) (kg).
  • 1005.90.20.25 Other (under: Yellow dent corn) (kg).
  • 1005.90.40 Other (under: Other): General 0.25¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 0.98¢/kg.
  • 1005.90.40.40 Popcorn (under: Other) (kg).
  • 1005.90.40.60 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.