HTS Heading 1006
Rice
All 18 HTS codes under heading 1006 (rice), with their duty rates from the 2026 HTS Revision 23. General duty Free to 11.2%, some per unit.
Every line of heading 1006
- 1006 Rice.
- 1006.10.00.00 Rice in the husk (paddy or rough) (kg): General 1.8¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 2.8¢/kg.
- 1006.20 Husked (brown) rice (under: Rice).
- 1006.20.20 Basmati (under: Husked (brown) rice): General 0.83¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 3.3¢/kg.
- 1006.20.20.10 Certified organic (under: Basmati) (kg).
- 1006.20.20.90 Other (under: Basmati) (kg).
- 1006.20.40 Other (under: Husked (brown) rice): General 2.1¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 3.3¢/kg.
- 1006.20.40.25 Jasmine (under: Long grain) (kg).
- 1006.20.40.35 Other (under: Long grain) (kg).
- 1006.20.40.40 Medium grain (under: Other) (kg).
- 1006.20.40.60 Short grain (under: Other) (kg).
- 1006.20.40.80 Mixtures of any of the above (under: Other) (kg).
- 1006.30 Semi-milled or wholly milled rice, whether or not polished or glazed.
- 1006.30.10 Parboiled (under: Semi-milled or wholly milled rice, whether or not polished or glazed): General 11.2%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 1006.30.10.20 Long grain (under: Parboiled) (kg).
- 1006.30.10.40 Other, including mixtures (under: Parboiled) (kg).
- 1006.30.90 Other (under: Semi-milled or wholly milled rice, whether or not polished or glazed): General 1.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 5.5¢/kg.
- 1006.30.90.15 Certified Organic (under: Other) (kg).
- 1006.30.90.57 Jasmine (under: Long grain) (kg).
- 1006.30.90.59 Basmati (under: Long grain) (kg).
- 1006.30.90.61 Other (under: Long grain) (kg).
- 1006.30.90.65 Medium grain (under: Other) (kg).
- 1006.30.90.75 Short grain (under: Other) (kg).
- 1006.30.90.85 Mixtures of any of the above (under: Other) (kg).
- 1006.40.00.00 Broken rice (under: Rice) (kg): General 0.44¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1.4¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.