HTS Heading 1007

Grain sorghum

All 2 HTS codes under heading 1007 (grain sorghum), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 1007

  • 1007 Grain sorghum.
  • 1007.10.00.00 Seed (under: Grain sorghum) (kg): General 0.22¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 1007.90.00.00 Other (under: Grain sorghum) (kg): General 0.22¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.