HTS Heading 1106
Flour, meal and powder of the dried leguminous vegetables of heading 0713, of sago or of roots or tubers of heading 0714 or of the products of chapter 8
All 5 HTS codes under heading 1106 (flour), with their duty rates from the 2026 HTS Revision 23. General duty Free to 9.6%.
Every line of heading 1106
- 1106 Flour, meal and powder of the dried leguminous vegetables of heading 0713, of sago or of roots or tubers of heading 0714 or of the products of chapter 8.
- 1106.10.00.00 Of the dried leguminous vegetables of heading 0713 (kg): General 8.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 1106.20 Of sago or of roots or tubers of heading 0714.
- 1106.20.10.00 Of Chinese water chestnuts (under: Of sago or of roots or tubers of heading 0714) (kg): General 8.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 1106.20.90.00 Other (under: Of sago or of roots or tubers of heading 0714) (kg): General Free; Special none; Column 2 Free.
- 1106.30 Of the products of chapter 8 (under: Flour, meal and powder of the dried leguminous vegetables of heading 0713, of sago or of roots or tubers of heading 0714 or of the products of chapter 8).
- 1106.30.20.00 Banana and plantain (under: Of the products of chapter 8) (kg): General 2.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1106.30.40.00 Other (under: Of the products of chapter 8) (kg): General 9.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.