HTS Chapter 11
Products of the milling industry; malt; starches; inulin; wheat gluten
The 9 headings and 51 HTS codes of chapter 11 (products of the milling industry), with their duty rates from the 2026 HTS Revision 23.
The 9 headings of chapter 11
- 1101: Wheat or meslin flour (5 codes, General duty Free, some per unit)
- 1102: Cereal flours other than of wheat or meslin (6 codes, General duty Free to 12.8%, some per unit)
- 1103: Cereal groats, meal and pellets (9 codes, General duty Free to 9%, some per unit)
- 1104: Cereal grains otherwise worked (for example, hulled, rolled, flaked, pearled, sliced or kibbled), except rice of heading 1006; germ of cereals, whole, rolled, flaked or ground (9 codes, General duty Free to 4.5%, some per unit)
- 1105: Flour, meal, powder, flakes, granules and pellets of potatoes (2 codes, General duty Free, some per unit)
- 1106: Flour, meal and powder of the dried leguminous vegetables of heading 0713, of sago or of roots or tubers of heading 0714 or of the products of chapter 8 (5 codes, General duty Free to 9.6%)
- 1107: Malt, whether or not roasted (2 codes, General duty Free, some per unit)
- 1108: Starches; inulin (10 codes, General duty Free to 2.6%, some per unit)
- 1109: Wheat gluten, whether or not dried (3 codes, General duty 1.8% to 6.8%)
Where it sits in the schedule
Chapter 11 is in Section II of the Harmonized System, vegetable products (chapters 6 to 14). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.