HTS Heading 1201

Soybeans, whether or not broken

All 4 HTS codes under heading 1201 (soybeans, whether or not broken), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 1201

  • 1201 Soybeans, whether or not broken.
  • 1201.10.00.00 Seed (under: Soybeans, whether or not broken) (kg): General Free; Special none; Column 2 4.4¢/kg.
  • 1201.90.00 Other (under: Soybeans, whether or not broken): General Free; Special none; Column 2 4.4¢/kg.
  • 1201.90.00.05 Seeds of a kind used as oil stock (kg).
  • 1201.90.00.10 Certified organic (under: Other) (kg).
  • 1201.90.00.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.