HTS Heading 1109
Wheat gluten, whether or not dried
All 3 HTS codes under heading 1109 (wheat gluten, whether or not dried), with their duty rates from the 2026 HTS Revision 23. General duty 1.8% to 6.8%.
Every line of heading 1109
- 1109.00 Wheat gluten, whether or not dried.
- 1109.00.10.00 To be used as animal feed (under: Wheat gluten, whether or not dried) (kg): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1109.00.90 Other (under: Wheat gluten, whether or not dried) (kg): General 6.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1109.00.90.10 Certified organic (under: Other) (kg).
- 1109.00.90.20 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.