HTS Heading 1204
Flaxseed (linseed), whether or not broken
All 5 HTS codes under heading 1204 (flaxseed (linseed)), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 1204
- 1204.00.00 Flaxseed (linseed), whether or not broken: General 0.39¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 2.55¢/kg.
- 1204.00.00.10 For sowing (under: Flaxseed (linseed), whether or not broken) (kg).
- 1204.00.00.25 Certified organic (under: For use as oil stock) (kg).
- 1204.00.00.35 Other (under: For use as oil stock) (kg).
- 1204.00.00.55 Certified organic (under: Other) (kg).
- 1204.00.00.75 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.