HTS Heading 1205

Rape or colza seeds, whether or not broken

All 6 HTS codes under heading 1205 (rape or colza seeds), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 1205

  • 1205 Rape or colza seeds, whether or not broken.
  • 1205.10.00 Low erucic acid rape or colza seeds: General 0.58¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.
  • 1205.10.00.10 For sowing (under: Low erucic acid rape or colza seeds) (kg).
  • 1205.10.00.20 For use as oil stock (under: Low erucic acid rape or colza seeds) (kg).
  • 1205.10.00.90 Other (under: Low erucic acid rape or colza seeds) (kg).
  • 1205.90.00 Other (under: Rape or colza seeds, whether or not broken): General 0.58¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.
  • 1205.90.00.10 For sowing (under: Other) (kg).
  • 1205.90.00.20 For use as oil stock (under: Other) (kg).
  • 1205.90.00.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.