HTS Heading 1206

Sunflower seeds, whether or not broken

All 7 HTS codes under heading 1206 (sunflower seeds, whether or not broken), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 1206

  • 1206.00.00 Sunflower seeds, whether or not broken: General Free; Special none; Column 2 4.4¢/kg.
  • 1206.00.00.20 For use as oil stock (under: Sunflower seeds, whether or not broken) (kg).
  • 1206.00.00.31 For sowing (under: Sunflower seeds, whether or not broken) (kg).
  • 1206.00.00.65 Certified organic (under: In-shell) (kg).
  • 1206.00.00.70 Other (under: In-shell) (kg).
  • 1206.00.00.75 Certified organic (under: Other) (kg).
  • 1206.00.00.80 Other (under: Other) (kg).
  • 1206.00.00.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.