HTS Heading 1210
Hop cones, fresh or dried, whether or not ground, powdered or in the form of pellets; lupulin
All 3 HTS codes under heading 1210 (hop cones, fresh or dried), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 1210
- 1210 Hop cones, fresh or dried, whether or not ground, powdered or in the form of pellets; lupulin.
- 1210.10.00.00 Hop cones, neither ground nor powdered nor in the form of pellets (kg): General 13.2¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 53¢/kg.
- 1210.20.00 Hop cones, ground, powdered or in the form of pellets; lupulin: General 13.2¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 53¢/kg.
- 1210.20.00.20 Hop cone pellets (under: Hop cones, ground, powdered or in the form of pellets; lupulin) (kg).
- 1210.20.00.40 Other (under: Hop cones, ground, powdered or in the form of pellets; lupulin) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.