HTS Heading 1211
Plants and parts of plants (including seeds and fruits), of a kind used primarily in perfumery, in pharmacy or for insecticidal, fungicidal or similar purposes, fresh, chilled, frozen or dried, whether or not cut, crushed or powdered
All 19 HTS codes under heading 1211 (plants and parts of plants), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%, some per unit.
Every line of heading 1211
- 1211 Plants and parts of plants (including seeds and fruits), of a kind used primarily in perfumery, in pharmacy or for insecticidal, fungicidal or similar purposes, fresh, chilled, frozen or dried, whether or not cut, crushed or powdered.
- 1211.20 Ginseng roots (under: Plants and parts of plants (including seeds and fruits), of a kind used primarily in perfumery, in pharmacy or for insecticidal, fungicidal or similar purposes, fresh, chilled, frozen or dried, whether or not cut, crushed or powdered).
- 1211.20.10 Fresh or dried (under: Ginseng roots): General Free; Special none; Column 2 Free.
- 1211.20.10.20 Cultivated (under: Fresh or dried) (kg).
- 1211.20.10.90 Wild (under: Fresh or dried) (kg).
- 1211.20.15.00 Chilled or frozen (under: Ginseng roots) (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 1211.30.00.00 Coca leaf (under: Plants and parts of plants (including seeds and fruits), of a kind used primarily in perfumery, in pharmacy or for insecticidal, fungicidal or similar purposes, fresh, chilled, frozen or dried, whether or not cut, crushed or powdered) (kg): General Free; Special none; Column 2 Free.
- 1211.40.00.00 Poppy straw (under: Plants and parts of plants (including seeds and fruits), of a kind used primarily in perfumery, in pharmacy or for insecticidal, fungicidal or similar purposes, fresh, chilled, frozen or dried, whether or not cut, crushed or powdered) (kg): General Free; Special none; Column 2 Free.
- 1211.50.00.00 Ephedra (under: Plants and parts of plants (including seeds and fruits), of a kind used primarily in perfumery, in pharmacy or for insecticidal, fungicidal or similar purposes, fresh, chilled, frozen or dried, whether or not cut, crushed or powdered) (kg): General Free; Special none; Column 2 Free.
- 1211.60.00.00 Bark of African cherry (Prunus Africana) (kg): General Free; Special none; Column 2 Free.
- 1211.90 Other (under: Plants and parts of plants (including seeds and fruits), of a kind used primarily in perfumery, in pharmacy or for insecticidal, fungicidal or similar purposes, fresh, chilled, frozen or dried, whether or not cut, crushed or powdered).
- 1211.90.20.00 Crude or not manufactured (under: Mint leaves) (kg): General Free; Special none; Column 2 Free.
- 1211.90.40 Other (under: Mint leaves): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 1211.90.40.20 Herbal teas and herbal infusions (single species, unmixed) (kg).
- 1211.90.40.40 Other (under: Other) (kg).
- 1211.90.60.00 Tonka beans (under: Other) (kg): General 6.6¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55¢/kg.
- 1211.90.89 Fresh or dried (under: Other): General Free; Special none; Column 2 Free.
- 1211.90.89.20 Psyllium seed husks (under: Substances having anesthetic, prophylactic or therapeutic properties and principally used as medicaments or as ingredients in medicaments) (kg).
- 1211.90.89.31 Other (under: Substances having anesthetic, prophylactic or therapeutic properties and principally used as medicaments or as ingredients in medicaments) (kg).
- 1211.90.89.40 Basil (under: Fresh or dried) (kg).
- 1211.90.89.50 Sage (under: Fresh or dried) (kg).
- 1211.90.89.80 Herbal teas and herbal infusions (single species, unmixed) (kg).
- 1211.90.89.92 Certified organic (under: Other) (kg).
- 1211.90.89.97 Other (under: Other) (kg).
- 1211.90.93.00 Chilled or frozen (under: Other) (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.