HTS Heading 1502

Fats of bovine animals, sheep or goats, other than those of heading 1503

All 3 HTS codes under heading 1502 (fats of bovine animals), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 1502

  • 1502 Fats of bovine animals, sheep or goats, other than those of heading 1503.
  • 1502.10.00 Tallow (under: Fats of bovine animals, sheep or goats, other than those of heading 1503): General 0.43¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 7.7¢/kg.
  • 1502.10.00.20 Edible (under: Tallow) (kg).
  • 1502.10.00.40 Inedible (under: Tallow) (kg).
  • 1502.90.00.00 Other (under: Fats of bovine animals, sheep or goats, other than those of heading 1503) (kg): General 0.43¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 7.7¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.