HTS Heading 1501
Pig fat (including lard) and poultry fat, other than that of heading 0209 or 1503
All 5 HTS codes under heading 1501 (pig fat (including lard)), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 1501
- 1501 Pig fat (including lard) and poultry fat, other than that of heading 0209 or 1503.
- 1501.10.00.00 Lard (under: Pig fat (including lard) and poultry fat, other than that of heading 0209 or 1503) (kg): General 3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
- 1501.20.00 Other pig fat (under: Pig fat (including lard) and poultry fat, other than that of heading 0209 or 1503): General 3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
- 1501.20.00.40 Choice white grease (under: Other pig fat) (kg).
- 1501.20.00.60 Yellow grease (under: Other pig fat) (kg).
- 1501.20.00.80 Other (under: Other pig fat) (kg).
- 1501.90.00.00 Other (under: Pig fat (including lard) and poultry fat, other than that of heading 0209 or 1503) (kg): General 3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.