HTS Heading 1504

Fats and oils and their fractions, of fish or marine mammals, whether or not refined, but not chemically modified

All 7 HTS codes under heading 1504 (fats and oils), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5%, some per unit.

Every line of heading 1504

  • 1504 Fats and oils and their fractions, of fish or marine mammals, whether or not refined, but not chemically modified.
  • 1504.10 Fish-liver oils and their fractions.
  • 1504.10.20.00 Cod (under: Fish-liver oils and their fractions) (kg): General Free; Special none; Column 2 Free.
  • 1504.10.40.00 Other (under: Fish-liver oils and their fractions) (kg): General 2.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 6.6¢/kg + 10%.
  • 1504.20 Fats and oils and their fractions, of fish, other than liver oils.
  • 1504.20.20.00 Cod (under: Fats and oils and their fractions, of fish, other than liver oils) (kg): General Free; Special none; Column 2 Free.
  • 1504.20.40.00 Herring (under: Fats and oils and their fractions, of fish, other than liver oils) (kg): General 1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢/kg.
  • 1504.20.60 Other (under: Fats and oils and their fractions, of fish, other than liver oils): General 1.5¢/kg + 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg + 20%.
  • 1504.20.60.20 Menhaden (under: Other) (kg).
  • 1504.20.60.40 Other (under: Other) (kg).
  • 1504.30.00.00 Fats and oils and their fractions, of marine mammals (kg): General 1.7¢/kg + 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg + 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.