HTS Heading 1505

Wool grease and fatty substances derived therefrom (including lanolin)

All 2 HTS codes under heading 1505 (wool grease), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.4%, some per unit.

Every line of heading 1505

  • 1505.00 Wool grease and fatty substances derived therefrom (including lanolin).
  • 1505.00.10.00 Wool grease, crude (under: Wool grease and fatty substances derived therefrom (including lanolin)) (kg): General 1.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9.5¢/kg.
  • 1505.00.90.00 Other (under: Wool grease and fatty substances derived therefrom (including lanolin)) (kg): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.