HTS Heading 1507

Soybean oil and its fractions, whether or not refined, but not chemically modified

All 4 HTS codes under heading 1507 (soybean oil and its fractions), with their duty rates from the 2026 HTS Revision 23. General duty Free to 19.1%.

Every line of heading 1507

  • 1507 Soybean oil and its fractions, whether or not refined, but not chemically modified.
  • 1507.10.00.00 Crude oil, whether or not degummed (kg): General 19.1%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 1507.90 Other (under: Soybean oil and its fractions, whether or not refined, but not chemically modified).
  • 1507.90.20.00 Pharmaceutical Grade meeting FDA requirements for use in intravenous fat emulsions, valued over $5/kg (kg): General Free; Special none; Column 2 10%.
  • 1507.90.40 Other (under: Other): General 19.1%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 1507.90.40.20 Once-refined (subjected to alkali or caustic wash, but not bleached or deodorized) (kg).
  • 1507.90.40.40 Other (fully refined, washed, bleached or deodorized) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.