HTS Heading 1508

Peanut (ground-nut) oil and its fractions, whether or not refined, but not chemically modified

All 2 HTS codes under heading 1508 (peanut (ground-nut) oil), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 1508

  • 1508 Peanut (ground-nut) oil and its fractions, whether or not refined, but not chemically modified.
  • 1508.10.00.00 Crude oil (under: Peanut (ground-nut) oil and its fractions, whether or not refined, but not chemically modified) (kg): General 7.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.8¢/kg.
  • 1508.90.00.00 Other (under: Peanut (ground-nut) oil and its fractions, whether or not refined, but not chemically modified) (kg): General 7.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.8¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.