HTS Heading 1510

Other oils and their fractions, obtained solely from olives, whether or not refined, but not chemically modified, including blends of these oils and fractions with oils or fractions of heading 1509

All 5 HTS codes under heading 1510 (other oils and their fractions), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 1510

  • 1510 Other oils and their fractions, obtained solely from olives, whether or not refined, but not chemically modified, including blends of these oils and fractions with oils or fractions of heading 1509.
  • 1510.10 Crude olive pomace oil (under: Other oils and their fractions, obtained solely from olives, whether or not refined, but not chemically modified, including blends of these oils and fractions with oils or fractions of heading 1509).
  • 1510.10.10.00 Weighing with the immediate container under 18 kg (kg): General 5¢/kg on contents and container; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.6¢/kg on contents and container.
  • 1510.10.90.00 Other (under: Crude olive pomace oil) (kg): General 3.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 14.3¢/kg.
  • 1510.90 Other (under: Other oils and their fractions, obtained solely from olives, whether or not refined, but not chemically modified, including blends of these oils and fractions with oils or fractions of heading 1509).
  • 1510.90.10.00 Rendered unfit for use as food (kg): General Free; Special none; Column 2 Free.
  • 1510.90.20.00 Weighing with the immediate container under 18 kg (kg): General 5¢/kg on contents and container; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.6¢/kg on contents and container.
  • 1510.90.90.00 Other (under: Other) (kg): General 3.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 14.3¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.