HTS Heading 1511

Palm oil and its fractions, whether or not refined, but not chemically modified

All 2 HTS codes under heading 1511 (palm oil and its fractions, whether or not refined), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 1511

  • 1511 Palm oil and its fractions, whether or not refined, but not chemically modified.
  • 1511.10.00.00 Crude oil (under: Palm oil and its fractions, whether or not refined, but not chemically modified) (kg): General Free; Special none; Column 2 Free.
  • 1511.90.00.00 Other (under: Palm oil and its fractions, whether or not refined, but not chemically modified) (kg): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.