HTS Heading 1518

Animal, vegetable or microbial fats and oils and their fractions, boiled, oxidized, dehydrated, sulfurized, blown, polymerized by heat in vacuum or in inert gas or otherwise chemically modified, excluding those of heading 1516; inedible mixtures or preparations of animal, vegetable or microbial fats or oils or of fractions of different fats or oils of this chapter, not elsewhere specified or included

All 2 HTS codes under heading 1518 (animal), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8%, some per unit.

Every line of heading 1518

  • 1518.00 Animal, vegetable or microbial fats and oils and their fractions, boiled, oxidized, dehydrated, sulfurized, blown, polymerized by heat in vacuum or in inert gas or otherwise chemically modified, excluding those of heading 1516; inedible mixtures or preparations of animal, vegetable or microbial fats or oils or of fractions of different fats or oils of this chapter, not elsewhere specified or included.
  • 1518.00.20.00 Of linseed or flaxseed oil (under: Animal, vegetable or microbial fats and oils and their fractions, boiled, oxidized, dehydrated, sulfurized, blown, polymerized by heat in vacuum or in inert gas or otherwise chemically modified, excluding those of heading 1516; inedible mixtures or preparations of animal, vegetable or microbial fats or oils or of fractions of different fats or oils of this chapter, not elsewhere specified or included) (kg): General 6.3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 9.9¢/kg.
  • 1518.00.40.00 Other (under: Animal, vegetable or microbial fats and oils and their fractions, boiled, oxidized, dehydrated, sulfurized, blown, polymerized by heat in vacuum or in inert gas or otherwise chemically modified, excluding those of heading 1516; inedible mixtures or preparations of animal, vegetable or microbial fats or oils or of fractions of different fats or oils of this chapter, not elsewhere specified or included) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.