HTS Heading 1517
Margarine; edible mixtures or preparations of animal, vegetable or microbial fats or oils or of fractions of different fats or oils of this chapter, other than edible fats or oils or their fractions of heading 1516
All 16 HTS codes under heading 1517 (margarine), with their duty rates from the 2026 HTS Revision 23. General duty Free to 18%, some per unit.
Every line of heading 1517
- 1517 Margarine; edible mixtures or preparations of animal, vegetable or microbial fats or oils or of fractions of different fats or oils of this chapter, other than edible fats or oils or their fractions of heading 1516.
- 1517.10.00.00 Margarine, excluding liquid margarine (kg): General 12.3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 31¢/kg.
- 1517.90 Other (under: Margarine; edible mixtures or preparations of animal, vegetable or microbial fats or oils or of fractions of different fats or oils of this chapter, other than edible fats or oils or their fractions of heading 1516).
- 1517.90.10 Containing 5 percent or more by weight of soybean oil or any fraction thereof: General 18%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 1517.90.10.20 Salad and cooking oils (under: Containing 5 percent or more by weight of soybean oil or any fraction thereof) (kg).
- 1517.90.10.40 Wholly of vegetable oils (under: Baking or frying fats) (kg).
- 1517.90.10.60 Other (under: Baking or frying fats) (kg).
- 1517.90.10.80 Other (under: Containing 5 percent or more by weight of soybean oil or any fraction thereof) (kg).
- 1517.90.20 Other (under: Artificial mixtures of two or more of the products provided for in headings 1501 to 1515, inclusive): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 1517.90.20.20 Salad and cooking oils (under: Other) (kg).
- 1517.90.20.40 Wholly of vegetable oils (under: Baking or frying fats) (kg).
- 1517.90.20.60 Other (under: Baking or frying fats) (kg).
- 1517.90.20.80 Other (under: Other) (kg).
- 1517.90.45.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 11¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 1517.90.50.00 Described in additional U.S. note 10 to chapter 4 and entered pursuant to its provisions (kg, kg cmsc): General 11¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 1517.90.60.00 Other (under: Dairy products described in additional U.S. note 1 to chapter 4) (kg, kg cmsc): General 34.2¢/kg; Special Free (BH,CL,JO,KR,MA,OM,P,PA,PE,S,SG) See 9822.04.25 (AU) See 9918.04.60, 9918.04.68 (CO); Column 2 40.2¢/kg.
- 1517.90.90 Other (under: Other): General 8.8¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
- 1517.90.90.15 Partially hydrogenated salad and cooking oil (kg).
- 1517.90.90.25 Soybean oil, wholly hydrogenated (kg).
- 1517.90.90.85 Cottonseed oil, wholly hydrogenated (kg).
- 1517.90.90.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.