HTS Heading 1603

Extracts and juices of meat, fish or crustaceans, molluscs or other aquatic invertebrates

All 3 HTS codes under heading 1603 (extracts and juices of meat), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.5%.

Every line of heading 1603

  • 1603.00 Extracts and juices of meat, fish or crustaceans, molluscs or other aquatic invertebrates.
  • 1603.00.10.00 Clam juice (under: Extracts and juices of meat, fish or crustaceans, molluscs or other aquatic invertebrates) (kg): General 8.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 35%.
  • 1603.00.90 Other (under: Extracts and juices of meat, fish or crustaceans, molluscs or other aquatic invertebrates): General Free; Special none; Column 2 13%.
  • 1603.00.90.10 Of meat (under: Other) (kg).
  • 1603.00.90.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.