HTS Heading 1605
Crustaceans, molluscs and other aquatic invertebrates, prepared or preserved
All 64 HTS codes under heading 1605 (crustaceans), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10%.
Every line of heading 1605
- 1605 Crustaceans, molluscs and other aquatic invertebrates, prepared or preserved.
- 1605.10 Crab (under: Crustaceans, molluscs and other aquatic invertebrates, prepared or preserved).
- 1605.10.05 Products containing fish meat; prepared meals: General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1605.10.05.10 In airtight containers (under: Products containing fish meat; prepared meals) (kg).
- 1605.10.05.90 Other (under: Products containing fish meat; prepared meals) (kg).
- 1605.10.20 In airtight containers (under: Crabmeat): General Free; Special none; Column 2 22.5%.
- 1605.10.20.10 King crab (under: In airtight containers) (kg).
- 1605.10.20.22 C. opilio (small) (under: Snow crab (Chionoecetes bairdi, C. opilio, C. tanneri and C. angulatus)) (kg).
- 1605.10.20.25 Other (under: Snow crab (Chionoecetes bairdi, C. opilio, C. tanneri and C. angulatus)) (kg).
- 1605.10.20.30 Dungeness (under: In airtight containers) (kg).
- 1605.10.20.51 Callinectes spp., including blue crabs (C. sapidus) (kg).
- 1605.10.20.59 Other (under: Swimming crabs (Portunidae)) (kg).
- 1605.10.20.90 Other (under: In airtight containers) (kg).
- 1605.10.40 Other (under: Crabmeat): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15%.
- 1605.10.40.02 King crab (under: Frozen) (kg).
- 1605.10.40.05 C. opilio (small) (under: Snow crab (Chionoecetes bairdi, C. opilio, C. tanneri and C. angulatus)) (kg).
- 1605.10.40.10 Other (under: Snow crab (Chionoecetes bairdi, C. opilio, C. tanneri and C. angulatus)) (kg).
- 1605.10.40.15 Dungeness (under: Frozen) (kg).
- 1605.10.40.25 Callinectes spp., including blue crabs (C. sapidus) (kg).
- 1605.10.40.30 Other (under: Swimming crabs (Portunidae)) (kg).
- 1605.10.40.35 Other (under: Frozen) (kg).
- 1605.10.40.40 Other (under: Other) (kg).
- 1605.10.60 Other (under: Other): General Free; Special none; Column 2 Free.
- 1605.10.60.10 In airtight containers (under: Other) (kg).
- 1605.10.60.90 Other (under: Other) (kg).
- 1605.21 Not in airtight containers (under: Shrimps and prawns).
- 1605.21.05.00 Products containing fish meat; prepared meals (kg): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1605.21.10 Other (under: Not in airtight containers): General Free; Special none; Column 2 Free.
- 1605.21.10.20 Breaded (under: Frozen, imported in accordance with statistical note 1 to this chapter) (kg).
- 1605.21.10.30 Other (under: Frozen, imported in accordance with statistical note 1 to this chapter) (kg).
- 1605.21.10.50 Other, imported in accordance with statistical note 1 to this chapter (kg).
- 1605.29 Other (under: Shrimps and prawns).
- 1605.29.05.00 Products containing fish meat; prepared meals (kg): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1605.29.10 Other (under: Other): General Free; Special none; Column 2 Free.
- 1605.29.10.10 Frozen, imported in accordance with statistical note 1 to this chapter (kg).
- 1605.29.10.40 Other, imported in accordance with statistical note 1 to this chapter (kg).
- 1605.30 Lobster (under: Crustaceans, molluscs and other aquatic invertebrates, prepared or preserved).
- 1605.30.05 Products containing fish meat; prepared meals: General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1605.30.05.10 In airtight containers (under: Products containing fish meat; prepared meals) (kg).
- 1605.30.05.90 Other (under: Products containing fish meat; prepared meals) (kg).
- 1605.30.10 Other (under: Lobster): General Free; Special none; Column 2 Free.
- 1605.30.10.10 Frozen (under: Lobster meat, cooked by steaming or boiling in water and out of shell, whether or not frozen but not further prepared or preserved) (kg).
- 1605.30.10.30 Not frozen (under: Lobster meat, cooked by steaming or boiling in water and out of shell, whether or not frozen but not further prepared or preserved) (kg).
- 1605.30.10.50 In airtight containers (under: Other) (kg).
- 1605.30.10.90 Other (under: Other) (kg).
- 1605.40 Other crustaceans (under: Crustaceans, molluscs and other aquatic invertebrates, prepared or preserved).
- 1605.40.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.40.10 Other (under: Other crustaceans): General Free; Special none; Column 2 Free.
- 1605.40.10.10 Peeled freshwater crawfish tail meat (kg).
- 1605.40.10.90 Other (under: Other) (kg).
- 1605.51 Oysters (under: Molluscs).
- 1605.51.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.51.40.00 Smoked (under: Other) (kg): General Free; Special none; Column 2 7.5%.
- 1605.51.50.00 Other (under: Other) (kg): General 4.7%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12.5%.
- 1605.52 Scallops, including queen scallops.
- 1605.52.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.52.60.00 Other (under: Scallops, including queen scallops) (kg): General Free; Special none; Column 2 Free.
- 1605.53 Mussels (under: Molluscs).
- 1605.53.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.53.60.00 Other (under: Mussels) (kg): General Free; Special none; Column 2 Free.
- 1605.54 Cuttle fish and squid (under: Molluscs).
- 1605.54.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.54.60 Other (under: Cuttle fish and squid): General Free; Special none; Column 2 Free.
- 1605.54.60.10 Cuttle fish (under: Other) (kg).
- 1605.54.60.20 Loligo (under: Squid) (kg).
- 1605.54.60.30 Other (under: Squid) (kg).
- 1605.55 Octopus (under: Molluscs).
- 1605.55.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.55.60.00 Other (under: Octopus) (kg): General Free; Special none; Column 2 Free.
- 1605.56 Clams, cockles and arkshells (under: Molluscs).
- 1605.56.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.56.10.00 Razor clams (Siliqua patula) (under: In airtight containers) (kg): General Free; Special none; Column 2 23%.
- 1605.56.15.00 Boiled clams, whether whole, minced or chopped, and whether or not salted, but not otherwise prepared or preserved, in immediate containers, the contents of each container not exceeding 680 grams gross weight (kg): General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
- 1605.56.20.00 Other (under: Other) (kg): General Free; Special none; Column 2 35%.
- 1605.56.30.00 Other (under: Clams) (kg): General Free; Special none; Column 2 Free.
- 1605.56.60.00 Other (under: Other) (kg): General Free; Special none; Column 2 Free.
- 1605.57 Abalone (under: Molluscs).
- 1605.57.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.57.60.00 Other (under: Abalone) (kg): General Free; Special none; Column 2 Free.
- 1605.58 Snails, other than sea snails.
- 1605.58.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.58.55.00 Other (under: Snails, other than sea snails) (kg): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1605.59 Other (under: Molluscs).
- 1605.59.05.00 Products containing fish meat; prepared meals (kg): General Free; Special none; Column 2 20%.
- 1605.59.60.00 Other (under: Other) (kg): General Free; Special none; Column 2 Free.
- 1605.61.00.00 Sea cucumbers (under: Other aquatic invertebrates) (kg): General Free; Special none; Column 2 Free.
- 1605.62.00.00 Sea urchins (under: Other aquatic invertebrates) (kg): General Free; Special none; Column 2 Free.
- 1605.63.00.00 Jellyfish (under: Other aquatic invertebrates) (kg): General Free; Special none; Column 2 Free.
- 1605.69.00.00 Other (under: Other aquatic invertebrates) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.