HTS Heading 1803

Cocoa paste, whether or not defatted

All 2 HTS codes under heading 1803 (cocoa paste), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 1803

  • 1803 Cocoa paste, whether or not defatted.
  • 1803.10.00.00 Not defatted (under: Cocoa paste, whether or not defatted) (kg): General Free; Special none; Column 2 6.6¢/kg.
  • 1803.20.00.00 Wholly or partly defatted (under: Cocoa paste, whether or not defatted) (kg): General 0.2¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.