HTS Chapter 18

Cocoa and cocoa preparations

The 6 headings and 91 HTS codes of chapter 18 (cocoa and cocoa preparations), with their duty rates from the 2026 HTS Revision 23.

The 6 headings of chapter 18

Where it sits in the schedule

Chapter 18 is in Section IV of the Harmonized System, prepared foods, beverages and tobacco (chapters 16 to 24). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.

Last reviewed 2026-11-12.