HTS Heading 1903
Tapioca and substitutes therefor prepared from starch, in the form of flakes, grains, pearls, siftings or in similar forms
All 2 HTS codes under heading 1903 (tapioca and substitutes therefor), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 1903
- 1903.00 Tapioca and substitutes therefor prepared from starch, in the form of flakes, grains, pearls, siftings or in similar forms.
- 1903.00.20.00 Of arrowroot, cassava or sago (kg): General Free; Special none; Column 2 Free.
- 1903.00.40.00 Other (under: Tapioca and substitutes therefor prepared from starch, in the form of flakes, grains, pearls, siftings or in similar forms) (kg): General 0.8¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 3.3¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.