HTS Heading 1904
Prepared foods obtained by the swelling or roasting of cereals or cereal products (for example, cornflakes); cereals (other than corn (maize)) in grain form or in the form of flakes or other worked grains (except flour, groats and meal), pre-cooked or otherwise prepared, not elsewhere specified or included
All 8 HTS codes under heading 1904 (prepared foods obtained by the swelling), with their duty rates from the 2026 HTS Revision 23. General duty 1.1% to 14.9%.
Every line of heading 1904
- 1904 Prepared foods obtained by the swelling or roasting of cereals or cereal products (for example, cornflakes); cereals (other than corn (maize)) in grain form or in the form of flakes or other worked grains (except flour, groats and meal), pre-cooked or otherwise prepared, not elsewhere specified or included.
- 1904.10.00 Prepared foods obtained by the swelling or roasting of cereals or cereal products: General 1.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1904.10.00.40 Containing cane and/or beet sugar (kg).
- 1904.10.00.65 Certified organic (under: Other) (kg).
- 1904.10.00.75 Other (under: Other) (kg).
- 1904.20 Prepared foods obtained from unroasted cereal flakes or from mixtures of unroasted cereal flakes and roasted cereal flakes or swelled cereals.
- 1904.20.10.00 In airtight containers and not containing apricots, citrus fruits, peaches or pears (kg): General 5.6%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
- 1904.20.90.00 Other (under: Prepared foods obtained from unroasted cereal flakes or from mixtures of unroasted cereal flakes and roasted cereal flakes or swelled cereals) (kg): General 14.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 1904.30.00.00 Bulgur wheat (under: Prepared foods obtained by the swelling or roasting of cereals or cereal products (for example, cornflakes); cereals (other than corn (maize)) in grain form or in the form of flakes or other worked grains (except flour, groats and meal), pre-cooked or otherwise prepared, not elsewhere specified or included) (kg): General 14%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 1904.90.01 Other (under: Prepared foods obtained by the swelling or roasting of cereals or cereal products (for example, cornflakes); cereals (other than corn (maize)) in grain form or in the form of flakes or other worked grains (except flour, groats and meal), pre-cooked or otherwise prepared, not elsewhere specified or included): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 1904.90.01.20 Frozen (under: Other) (kg).
- 1904.90.01.40 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.