HTS Heading 2001

Vegetables, fruit, nuts and other edible parts of plants, prepared or preserved by vinegar or acetic acid

All 14 HTS codes under heading 2001 (vegetables, fruit), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14%, some per unit.

Every line of heading 2001

  • 2001 Vegetables, fruit, nuts and other edible parts of plants, prepared or preserved by vinegar or acetic acid.
  • 2001.10.00.00 Cucumbers including gherkins (under: Vegetables, fruit, nuts and other edible parts of plants, prepared or preserved by vinegar or acetic acid) (kg): General 9.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2001.90 Other (under: Vegetables, fruit, nuts and other edible parts of plants, prepared or preserved by vinegar or acetic acid).
  • 2001.90.10.00 In immediate containers holding more than 3.4 kg (kg): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2001.90.20.00 Other (under: Capers) (kg): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2001.90.25.00 Artichokes (under: Vegetables) (kg): General 10.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2001.90.30.00 Beans (under: Vegetables) (kg): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2001.90.33.00 Nopalitos (under: Vegetables) (kg): General 7.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2001.90.34.00 Onions (under: Vegetables) (kg): General 3.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2001.90.35.00 Pimientos (Capsicum anuum) (under: Vegetables) (kg): General 8.1%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 2001.90.38.00 Other (under: Vegetables) (kg): General 9.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2001.90.42.00 Chestnuts, other than Chinese water chestnuts (kg): General 4.9¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55¢/kg.
  • 2001.90.45.00 Mangoes (under: Other) (kg): General 1.5¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33¢/kg.
  • 2001.90.48.00 Chinese water chestnuts (under: Other) (kg): General 9.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2001.90.50.00 Walnuts (under: Other) (kg): General 7¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33¢/kg.
  • 2001.90.60.00 Other (under: Other) (kg): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.