HTS Heading 2006

Vegetables, fruit, nuts, fruit-peel and other parts of plants preserved by sugar (drained, glacé or crystallized)

All 7 HTS codes under heading 2006 (vegetables, fruit, nuts), with their duty rates from the 2026 HTS Revision 23. General duty Free to 16%, some per unit.

Every line of heading 2006

  • 2006.00 Vegetables, fruit, nuts, fruit-peel and other parts of plants preserved by sugar (drained, glacé or crystallized).
  • 2006.00.20.00 Cherries (under: Vegetables, fruit, nuts, fruit-peel and other parts of plants preserved by sugar (drained, glacé or crystallized)) (kg): General 9.9¢/kg + 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9¢/kg + 40%.
  • 2006.00.30.00 Ginger root (under: Vegetables, fruit, nuts, fruit-peel and other parts of plants preserved by sugar (drained, glacé or crystallized)) (kg): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2006.00.40.00 Pineapples (under: Vegetables, fruit, nuts, fruit-peel and other parts of plants preserved by sugar (drained, glacé or crystallized)) (kg): General 2.1%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 35%.
  • 2006.00.50.00 Mixtures (under: Other, including mixtures) (kg): General 16%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2006.00.60.00 Citrus fruit; peel of citrus or other fruit (kg): General 6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 17.6¢/kg.
  • 2006.00.70.00 Other fruit and nuts (under: Other) (kg): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 2006.00.90.00 Other (under: Other) (kg): General 16%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.