HTS Heading 2005
Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, not frozen, other than products of heading 2006
All 59 HTS codes under heading 2005 (other vegetables prepared), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14.9%.
Every line of heading 2005
- 2005 Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, not frozen, other than products of heading 2006.
- 2005.10.00.00 Homogenized vegetables (under: Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, not frozen, other than products of heading 2006) (kg): General 11.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2005.20.00 Potatoes (under: Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, not frozen, other than products of heading 2006): General 6.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2005.20.00.20 Potato chips (under: Potatoes) (kg).
- 2005.20.00.40 Potato granules (under: Potatoes) (kg).
- 2005.20.00.70 Other (under: Potatoes) (kg).
- 2005.40.00.00 Peas (Pisum sativum) (under: Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, not frozen, other than products of heading 2006) (kg): General Free; Special none; Column 2 4.4¢/kg on entire contents of container.
- 2005.51 Beans, shelled (under: Beans (Vigna spp., Phaseolus spp.)).
- 2005.51.20 Black-eye cowpeas (under: Beans, shelled): General 1.5¢/kg on entire contents of container; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 6.6¢/kg on entire contents of container.
- 2005.51.20.20 Canned dried (under: Black-eye cowpeas) (kg).
- 2005.51.20.40 Other (under: Black-eye cowpeas) (kg).
- 2005.51.40 Other (under: Beans, shelled): General 2.1¢/kg on entire contents of container; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg on entire contents of container.
- 2005.51.40.20 Canned dried (under: Other) (kg).
- 2005.51.40.40 Other (under: Other) (kg).
- 2005.59.00.00 Other (under: Beans (Vigna spp., Phaseolus spp.)) (kg): General 1.5¢/kg on entire contents of container; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg on entire contents of container.
- 2005.60.00.00 Asparagus (under: Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, not frozen, other than products of heading 2006) (kg): General 14.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2005.70 Olives (under: Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, not frozen, other than products of heading 2006).
- 2005.70.02 In an aggregate quantity not to exceed 730 metric tons entered in any calendar year: General 5.4¢/kg on drained weight; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.4¢/kg on drained weight.
- 2005.70.02.30 In containers each holding more than 8 kg, drained weight (kg).
- 2005.70.02.60 In containers each holding 8 kg or less drained weight (kg).
- 2005.70.04 Other (under: Ripe, in containers each holding less than 13 kg, drained weight): General 3.7¢/kg on drained weight; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.4¢/kg on drained weight.
- 2005.70.04.30 In containers each holding more than 8 kg, drained weight (kg).
- 2005.70.04.60 In containers each holding 8 kg or less, drained weight (kg).
- 2005.70.06.00 Described in additional U.S. note 4 to this chapter and entered pursuant to its provisions (kg): General 3.7¢/kg on drained weight; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.4¢/kg on drained weight.
- 2005.70.08.00 Other (under: In containers each holding more than 8 kg, drained weight, certified by the importer to be used for repacking or sale as green olives) (kg): General 3.7¢/kg on drained weight; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.4¢/kg on drained weight.
- 2005.70.12.00 Other (under: Other) (kg): General 3.7¢/kg on drained weight; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.4¢/kg on drained weight.
- 2005.70.16.00 In an aggregate quantity not to exceed 2,700 metric tons in any calendar year (kg): General 5.4¢/kg on drained weight; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10.8¢/kg on drained weight.
- 2005.70.18.00 Other (under: Stuffed, in containers each holding not more than 1 kg, drained weight) (kg): General 6.9¢/kg on drained weight; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10.8¢/kg on drained weight.
- 2005.70.23.00 Other (under: Place packed) (kg): General 6.9¢/kg on drained weight; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10.8¢/kg on drained weight.
- 2005.70.25 Other (under: Pitted or stuffed): General 8.6¢/kg on drained weight; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10.8¢/kg on drained weight.
- 2005.70.25.10 Whole pitted (under: In containers each holding more than 8 kg, drained weight) (kg).
- 2005.70.25.20 Whole stuffed (under: In containers each holding more than 8 kg, drained weight) (kg).
- 2005.70.25.30 Other, including broken, sliced or salad style (kg).
- 2005.70.25.42 Spanish style of a kind described in statistical note 1 to this chapter (kg).
- 2005.70.25.46 Other (under: Whole pitted) (kg).
- 2005.70.25.50 Whole stuffed (under: In containers each holding 8 kg or less, drained weight) (kg).
- 2005.70.25.70 Spanish style of a kind described in statistical note 1 to this chapter (kg).
- 2005.70.25.80 Other (under: Other, including broken, sliced or salad style) (kg).
- 2005.70.50 Not pitted (under: Canned): General 9.3¢/kg on drained weight; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11.6¢/kg on drained weight.
- 2005.70.50.30 In containers each holding more than 0.3 kg, drained weight (kg).
- 2005.70.50.60 In containers each holding 0.3 kg or less, drained weight (kg).
- 2005.70.60 Other (under: Canned): General 10.1¢/kg on drained weight; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11.9¢/kg on drained weight.
- 2005.70.60.20 In containers each holding more than 0.3 kg, drained weight (kg).
- 2005.70.60.30 In containers each holding 0.3 kg or less, drained weight (kg).
- 2005.70.60.50 Sliced (under: Other) (kg).
- 2005.70.60.60 Chopped or minced (under: Other) (kg).
- 2005.70.60.70 Other, including wedged or broken (kg).
- 2005.70.70.00 In airtight containers of glass or metal (kg): General 9.9¢/kg on drained weight; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11.6¢/kg on drained weight.
- 2005.70.75 Other (under: Other than canned): General 4.3¢/kg on drained weight; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10¢/kg on drained weight.
- 2005.70.75.10 Whole pitted (under: Other) (kg).
- 2005.70.75.15 Sliced (under: Other) (kg).
- 2005.70.75.20 Chopped or minced (under: Other) (kg).
- 2005.70.75.25 Other, including wedged or broken (kg).
- 2005.70.91.00 In an aggregate quantity not to exceed 550 metric tons in any calendar year (kg): General 5.5¢/kg on drained weight; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg on drained weight.
- 2005.70.93.00 Other (under: Green, in containers each holding less than 13 kg, drained weight) (kg): General 8.8¢/kg on drained weight; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg on drained weight.
- 2005.70.97.00 Other (under: Otherwise prepared or preserved) (kg): General 8.8¢/kg on drained weight; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg on drained weight.
- 2005.80.00.00 Sweet corn (Zea mays var. saccharata) (kg): General 5.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2005.91 Bamboo Shoots (under: Other vegetables and mixtures of vegetables).
- 2005.91.60.00 In airtight containers (under: Bamboo Shoots) (kg): General Free; Special none; Column 2 35%.
- 2005.91.97.00 Other (under: Bamboo Shoots) (kg): General 11.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2005.99 Other (under: Other vegetables and mixtures of vegetables).
- 2005.99.10.00 Carrots in airtight containers (kg): General 6.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2005.99.20.00 Onions (under: Other) (kg): General 4.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2005.99.30.00 Sauerkraut (under: Other) (kg): General 4.8%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 50%.
- 2005.99.41 Water chestnuts, other than Chinese water chestnuts: General Free; Special none; Column 2 35%.
- 2005.99.41.10 Sliced (under: Water chestnuts, other than Chinese water chestnuts) (kg).
- 2005.99.41.20 Whole (under: Water chestnuts, other than Chinese water chestnuts) (kg).
- 2005.99.50 Pimientos (Capsicum anuum) (under: Fruits of the genus Capsicum (peppers) or of the genus Pimenta (e.g., allspice)): General 8.1%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
- 2005.99.50.20 In containers each holding not more than 227 g (kg).
- 2005.99.50.40 Other (under: Pimientos (Capsicum anuum)) (kg).
- 2005.99.55 Other (under: Fruits of the genus Capsicum (peppers) or of the genus Pimenta (e.g., allspice)): General 14.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2005.99.55.10 Sweet bell-type peppers (under: Other) (kg).
- 2005.99.55.90 Other (under: Other) (kg).
- 2005.99.80.00 Artichokes (under: Other) (kg): General 14.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2005.99.85.00 Chickpeas (garbanzos) (under: Other) (kg): General 0.8¢/kg on entire contents of container; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg on entire contents of container.
- 2005.99.97.00 Other (under: Other) (kg): General 11.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.