HTS Heading 2008

Fruit, nuts and other edible parts of plants, otherwise prepared or preserved, whether or not containing added sugar or other sweetening matter or spirit, not elsewhere specified or included

All 89 HTS codes under heading 2008 (fruit), with their duty rates from the 2026 HTS Revision 23. General duty Free to 131.8%, some per unit.

Every line of heading 2008

  • 2008 Fruit, nuts and other edible parts of plants, otherwise prepared or preserved, whether or not containing added sugar or other sweetening matter or spirit, not elsewhere specified or included.
  • 2008.11 Peanuts (ground-nuts) (under: Nuts, peanuts (ground-nuts) and other seeds, whether or not mixed together).
  • 2008.11.02.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General Free; Special none; Column 2 15¢/kg.
  • 2008.11.05.00 Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions (kg): General Free; Special none; Column 2 15¢/kg.
  • 2008.11.15.00 Other (under: Peanut butter and paste) (kg): General 131.8%; Special Free (AU,BH,CL,CO,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 155%.
  • 2008.11.43.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 6.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 15¢/kg.
  • 2008.11.46.00 Described in additional U.S. note 2 to chapter 12 and entered pursuant to its provisions (kg): General 6.6¢/kg; Special Free (A*,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15¢/kg.
  • 2008.11.61.00 Other (under: Other) (kg): General 131.8%; Special Free (AU,BH,CL,CO,JO,KR,MA,OM,P,PA,PE,S,SG) See 9908.12.01 (IL); Column 2 155%.
  • 2008.19 Other, including mixtures (under: Nuts, peanuts (ground-nuts) and other seeds, whether or not mixed together).
  • 2008.19.10 Brazil nuts and cashews (under: Other, including mixtures): General Free; Special none; Column 2 10¢/kg.
  • 2008.19.10.20 Brazil nuts (under: Brazil nuts and cashews) (kg).
  • 2008.19.10.40 Cashews (under: Brazil nuts and cashews) (kg).
  • 2008.19.15.00 Coconuts (under: Other, including mixtures) (kg): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2008.19.20.00 Filberts (under: Other, including mixtures) (kg): General 11.3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 22¢/kg.
  • 2008.19.25.00 Pecans (under: Other, including mixtures) (kg): General 9.9¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22¢/kg.
  • 2008.19.30 Pignolia and pistachios (under: Other, including mixtures): General 1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
  • 2008.19.30.10 Pignolia (under: Pignolia and pistachios) (kg).
  • 2008.19.30.20 Pistachios (under: Pignolia and pistachios) (kg).
  • 2008.19.40.00 Almonds (under: Other, including mixtures) (kg): General 32.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40.8¢/kg.
  • 2008.19.50.00 Watermelon seeds (under: Other, including mixtures) (kg): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2008.19.85.00 Mixtures (under: Other, including mixtures) (kg): General 22.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.19.90 Other (under: Other, including mixtures): General 17.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.19.90.10 Macadamia nuts (under: Other) (kg).
  • 2008.19.90.90 Other (under: Other) (kg).
  • 2008.20.00 Pineapples (under: Fruit, nuts and other edible parts of plants, otherwise prepared or preserved, whether or not containing added sugar or other sweetening matter or spirit, not elsewhere specified or included): General 0.35¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.
  • 2008.20.00.10 Containing cane and/or beet sugar (kg).
  • 2008.20.00.90 Other (under: Pineapples) (kg).
  • 2008.30 Citrus fruit (under: Fruit, nuts and other edible parts of plants, otherwise prepared or preserved, whether or not containing added sugar or other sweetening matter or spirit, not elsewhere specified or included).
  • 2008.30.10.00 Of oranges, mandarins (including tangerines and satsumas), clementines, wilkings and similar citrus hybrids (kg): General 2¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.6¢/kg.
  • 2008.30.20.00 Of lemons (under: Peel) (kg): General 4.2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 17.6¢/kg.
  • 2008.30.30.00 Other (under: Peel) (kg): General 11.3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.6¢/kg.
  • 2008.30.35.00 Orange (under: Pulp) (kg): General 11.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.30.37.00 Other (under: Pulp) (kg): General 6.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.30.40.00 Oranges (under: Other) (kg): General 1.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 2.2¢/kg.
  • 2008.30.42 For an aggregate quantity entered in any calendar year not to exceed 40,000 metric tons: General Free; Special none; Column 2 2.2¢/kg.
  • 2008.30.42.10 Containing cane and/or beet sugar (kg).
  • 2008.30.42.90 Other (under: For an aggregate quantity entered in any calendar year not to exceed 40,000 metric tons) (kg).
  • 2008.30.46.00 Other (under: Satsumas, in airtight containers) (kg): General 0.28¢/kg; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 2.2¢/kg.
  • 2008.30.48.00 Other (under: Mandarins) (kg): General 0.28¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 2.2¢/kg.
  • 2008.30.55.00 Other (under: Mandarins (including tangerines and satsumas); clementines, wilkings and similar citrus hybrids) (kg): General 1.4¢/kg; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 2.2¢/kg.
  • 2008.30.60.00 Lemons (under: Lemons (Citrus limon, Citrus limonum) and limes (Citrus aurantifolia, Citrus latifolia)) (kg): General 0.8¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
  • 2008.30.66.00 Limes (under: Lemons (Citrus limon, Citrus limonum) and limes (Citrus aurantifolia, Citrus latifolia)) (kg): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.30.70.00 Grapefruit (under: Other) (kg): General 1.1¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 3.3¢/kg.
  • 2008.30.80.00 Kumquats (under: Other) (kg): General 0.55¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 2.2¢/kg.
  • 2008.30.85.00 Citron (under: Other) (kg): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.30.96.00 Other, including bergamots (under: Other) (kg): General 14%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.40.00 Pears (under: Fruit, nuts and other edible parts of plants, otherwise prepared or preserved, whether or not containing added sugar or other sweetening matter or spirit, not elsewhere specified or included): General 15.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR, MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.40.00.20 In containers each holding less than 1.4 kg (kg).
  • 2008.40.00.40 Other (under: Pears) (kg).
  • 2008.50 Apricots (under: Fruit, nuts and other edible parts of plants, otherwise prepared or preserved, whether or not containing added sugar or other sweetening matter or spirit, not elsewhere specified or included).
  • 2008.50.20.00 Pulp (under: Apricots) (kg): General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.50.40.00 Other (under: Apricots) (kg): General 29.8%; Special Free (A+,AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.60.00 Cherries (under: Fruit, nuts and other edible parts of plants, otherwise prepared or preserved, whether or not containing added sugar or other sweetening matter or spirit, not elsewhere specified or included): General 6.9¢/kg + 4.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 21¢/kg + 40%.
  • 2008.60.00.20 Maraschino (under: Cherries) (kg).
  • 2008.60.00.40 Sweet varieties (under: Other) (kg).
  • 2008.60.00.60 Tart varieties (under: Other) (kg).
  • 2008.70 Peaches, including nectarines.
  • 2008.70.10 Nectarines (under: Peaches, including nectarines): General 16%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.70.10.20 In containers each holding less than 1.4 kg (kg).
  • 2008.70.10.40 Other (under: Nectarines) (kg).
  • 2008.70.20 Other peaches (under: Peaches, including nectarines): General 17%; Special Free (A+,AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.70.20.20 In containers each holding less than 1.4 kg (kg).
  • 2008.70.20.40 Other (under: Other peaches) (kg).
  • 2008.80.00.00 Strawberries (under: Fruit, nuts and other edible parts of plants, otherwise prepared or preserved, whether or not containing added sugar or other sweetening matter or spirit, not elsewhere specified or included) (kg): General 11.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.91.00.00 Palm hearts (under: Other, including mixtures other than those of subheading 2008.19) (kg): General 0.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.93.00.00 Cranberries (Vaccinium macrocarpon, Vaccinium oxycoccos); lingonberries (Vaccinium, vitis-idaea) (kg): General 4.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.97 Mixtures (under: Other, including mixtures other than those of subheading 2008.19).
  • 2008.97.10 In airtight containers and not containing apricots, citrus fruits, peaches or pears: General 5.6%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.97.10.20 Prepared cereal products (under: In airtight containers and not containing apricots, citrus fruits, peaches or pears) (kg).
  • 2008.97.10.40 Other (under: In airtight containers and not containing apricots, citrus fruits, peaches or pears) (kg).
  • 2008.97.90 Other (under: Mixtures): General 14.9%; Special Free (A+,AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.97.90.30 In containers each holding less than 1.4 kg (kg).
  • 2008.97.90.35 Other (under: Containing peaches or pears) (kg).
  • 2008.97.90.40 Containing oranges or grapefruit (kg).
  • 2008.97.90.50 Other (under: Other) (kg).
  • 2008.97.90.92 Prepared cereal products (under: Other) (kg).
  • 2008.97.90.94 Other (under: Other) (kg).
  • 2008.99 Other (under: Other, including mixtures other than those of subheading 2008.19).
  • 2008.99.05.00 Apples (under: Other) (kg): General 0.9¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
  • 2008.99.10 Avocados (under: Other): General 10.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33¢/kg.
  • 2008.99.10.10 Certified organic (under: Avocados) (kg).
  • 2008.99.10.90 Other (under: Avocados) (kg).
  • 2008.99.13.00 Pulp (under: Bananas) (kg): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.15.00 Other (under: Bananas) (kg): General 0.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.18 Blueberries (under: Berries): General 2.2%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 35%.
  • 2008.99.18.10 Wild blueberries, canned (under: Blueberries) (kg).
  • 2008.99.18.90 Other (under: Blueberries) (kg).
  • 2008.99.21 Other (under: Berries): General 4.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.21.20 Red Raspberries (under: Other) (kg).
  • 2008.99.21.40 Other (under: Other) (kg).
  • 2008.99.23.00 Cashew apples, mameyes colorados, sapodillas, soursops and sweetsops (kg): General 1.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.25.00 Dates (under: Other) (kg): General 22.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.28.00 Figs (under: Other) (kg): General 9.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 2008.99.29.00 Grapes (under: Other) (kg): General 7%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.30.00 Guavas (under: Other) (kg): General Free; Special none; Column 2 35%.
  • 2008.99.35.00 Lychees and longans (under: Other) (kg): General 7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.40.00 Mangoes (under: Other) (kg): General 1.5¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33¢/kg.
  • 2008.99.45.00 Pulp (under: Papayas) (kg): General 14%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.50.00 Other (under: Papayas) (kg): General 1.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.60.00 Plums (including prune plums and sloes) (kg): General 11.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.61.00 Soybeans (under: Other) (kg): General 3.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.63.00 Sweet ginger (under: Other) (kg): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.65.00 Cassava (manioc) (under: Other) (kg): General 7.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.70.00 Frozen (under: Chinese water chestnuts) (kg): General 11.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.71 Other (under: Chinese water chestnuts): General Free; Special none; Column 2 35%.
  • 2008.99.71.10 Sliced (under: Other) (kg).
  • 2008.99.71.20 Whole (under: Other) (kg).
  • 2008.99.80.00 Pulp (under: Other) (kg): General 9.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.91 Other (under: Other): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2008.99.91.10 Bean cake, bean stick, miso and similar products (kg).
  • 2008.99.91.50 Certified organic (under: Seaweed) (kg).
  • 2008.99.91.55 Other (under: Seaweed) (kg).
  • 2008.99.91.95 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.