HTS Heading 2009
Fruit or nut juices (including grape must and coconut water) and vegetable juices, unfermented and not containing added spirit, whether or not containing added sugar or other sweetening matter
All 64 HTS codes under heading 2009 (fruit or nut juices), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 2009
- 2009 Fruit or nut juices (including grape must and coconut water) and vegetable juices, unfermented and not containing added spirit, whether or not containing added sugar or other sweetening matter.
- 2009.11.00 Frozen (under: Orange juice): General 7.85¢/liter; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.11.00.20 In containers each holding less than 0.946 liter (liters).
- 2009.11.00.40 In containers each holding 0.946 liter or more but not more than 3.785 liters (liters).
- 2009.11.00.60 In containers of more than 3.785 liters (liters).
- 2009.12 Not frozen, of a Brix value not exceeding 20.
- 2009.12.25 Not concentrated and not made from a juice having a degree of concentration of 1.5 or more (as determined before correction to the nearest 0.5 degree): General 4.5¢/liter; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.12.25.10 Certified organic (under: Not concentrated and not made from a juice having a degree of concentration of 1.5 or more (as determined before correction to the nearest 0.5 degree)) (liters).
- 2009.12.25.90 Other (under: Not concentrated and not made from a juice having a degree of concentration of 1.5 or more (as determined before correction to the nearest 0.5 degree)) (liters).
- 2009.12.45.00 Other (under: Not frozen, of a Brix value not exceeding 20) (liters): General 7.85¢/liter; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.19.00.00 Other (under: Orange juice) (liters): General 7.85¢/liter; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.21 Of a Brix value not exceeding 20.
- 2009.21.20.00 Not concentrated and not made from a juice having a degree of concentration of 1.5 or more (as determined before correction to the nearest 0.5 degree) (liters): General 4.5¢/ liter; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.21.40 Other (under: Of a Brix value not exceeding 20): General 7.9¢/liter; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.21.40.20 Frozen (under: Other) (liters).
- 2009.21.40.40 Other (under: Other) (liters).
- 2009.29.00 Other (under: Grapefruit juice; pomelo juice): General 7.9¢/liter; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.29.00.20 Frozen (under: Other) (liters).
- 2009.29.00.40 Other (under: Other) (liters).
- 2009.31 Of a Brix value not exceeding 20.
- 2009.31.10 Unfit for beverage purposes (under: Lime): General 1.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 2009.31.10.20 Not concentrated (under: Unfit for beverage purposes) (kg, liters).
- 2009.31.10.40 Concentrated (under: Unfit for beverage purposes) (kg, liters).
- 2009.31.20 Other (under: Lime): General 1.7¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.31.20.20 Not concentrated (under: Other) (liters).
- 2009.31.20.40 Concentrated (under: Other) (liters).
- 2009.31.40.00 Not concentrated (under: Other) (liters): General 3.4¢/liter; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.31.60 Concentrated (under: Other): General 7.9¢/liter; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.31.60.20 Frozen (under: Lemon juice) (liters).
- 2009.31.60.40 Other (under: Lemon juice) (liters).
- 2009.31.60.60 Other (under: Concentrated) (liters).
- 2009.39 Other (under: Juice of any other single citrus fruit).
- 2009.39.10.00 Unfit for beverage purposes (under: Lime) (kg, liters): General 1.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 2009.39.20.00 Other (under: Lime) (liters): General 1.7¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.39.60 Other (under: Other): General 7.9¢/liter; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.39.60.20 Frozen (under: Lemon juice) (liters).
- 2009.39.60.40 Other (under: Lemon juice) (liters).
- 2009.39.60.60 Other (under: Other) (liters).
- 2009.41 Of a Brix value not exceeding 20.
- 2009.41.20.00 Not concentrated, or having a degree of concentration of not more than 3.5 (as determined before correction to the nearest 0.5 degree) (liters): General 4.2¢/liter; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.41.40 Other (under: Of a Brix value not exceeding 20): General 1¢/liter; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 18¢/liter.
- 2009.41.40.20 Frozen (under: Other) (liters).
- 2009.41.40.40 Other (under: Other) (liters).
- 2009.49 Other (under: Pineapple juice).
- 2009.49.20.00 Not concentrated, or having a degree of concentration of not more than 3.5 (as determined before correction to the nearest 0.5 degree) (liters): General 4.2¢/liter; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 18¢/liter.
- 2009.49.40 Other (under: Other): General 1¢/liter; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 18¢/liter.
- 2009.49.40.20 Frozen (under: Other) (liters).
- 2009.49.40.40 Other (under: Other) (liters).
- 2009.50.00 Tomato juice (under: Fruit or nut juices (including grape must and coconut water) and vegetable juices, unfermented and not containing added spirit, whether or not containing added sugar or other sweetening matter): General 0.14¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4¢/liter.
- 2009.50.00.10 In airtight containers (under: Tomato juice) (liters, kg).
- 2009.50.00.90 Other (under: Tomato juice) (liters, kg).
- 2009.61.00 Of a Brix value not exceeding 30: General 4.4¢/liter; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 26¢/liter.
- 2009.61.00.20 Not concentrated (under: Of a Brix value not exceeding 30) (liters).
- 2009.61.00.40 Frozen (under: Concentrated) (liters).
- 2009.61.00.60 Other (under: Concentrated) (liters).
- 2009.69.00 Other (under: Grape juice (including grape must)): General 4.4¢/liter; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 26¢/liter.
- 2009.69.00.40 Frozen (under: Other) (liters).
- 2009.69.00.60 Other (under: Other) (liters).
- 2009.71.00.00 Of a Brix value not exceeding 20 (liters, kg): General Free; Special none; Column 2 1.3¢/liter.
- 2009.79.00 Other (under: Apple juice): General Free; Special none; Column 2 1.3¢/liter.
- 2009.79.00.15 Certified organic (under: Frozen) (liters).
- 2009.79.00.17 Other (under: Frozen) (liters).
- 2009.79.00.40 Certified organic (under: Other) (liters).
- 2009.79.00.60 Other (under: Other) (liters).
- 2009.81.00.00 Cranberry (Vaccinium macrocarpon, Vaccinium oxycoccos) juice; lingonberry (Vaccinium, vitis-idaea) juice (liters): General 0.5¢/liter; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.89 Other (under: Juice of any other single fruit, nut or vegetable).
- 2009.89.20.00 Pear juice (under: Fruit juice) (liters): General Free; Special none; Column 2 1.3¢/liter.
- 2009.89.40.00 Prune juice (under: Fruit juice) (liters): General 0.64¢/liter; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 18¢/liter.
- 2009.89.65 Cherry Juice (under: Fruit juice): General 0.5¢/liter; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.89.65.15 Certified organic (under: Tart cherry juice concentrate) (liters).
- 2009.89.65.20 Other (under: Tart cherry juice concentrate) (liters).
- 2009.89.65.30 Certified organic (under: Tart cherry juice) (liters).
- 2009.89.65.40 Other (under: Tart cherry juice) (liters).
- 2009.89.65.50 Other (under: Cherry Juice) (liters).
- 2009.89.70 Other (under: Fruit juice): General 0.5¢/liter; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.89.70.31 Blueberry juice, including concentrate (liters).
- 2009.89.70.55 Red raspberry juice, including concentrate (liters).
- 2009.89.70.67 Certified organic (under: Other) (liters).
- 2009.89.70.69 Other (under: Other) (liters).
- 2009.89.70.70 Mango Juice (under: Other) (liters).
- 2009.89.70.95 Certified organic (under: Coconut water) (liters).
- 2009.89.70.97 Other (under: Coconut water) (liters).
- 2009.89.70.99 Other (under: Other) (liters).
- 2009.89.80 Vegetable juice (under: Other): General 0.2¢/liter; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4¢/liter.
- 2009.89.80.31 In airtight containers (under: Vegetable juice) (liters, kg).
- 2009.89.80.39 Other (under: Vegetable juice) (liters, kg).
- 2009.90 Mixtures of juices (under: Fruit or nut juices (including grape must and coconut water) and vegetable juices, unfermented and not containing added spirit, whether or not containing added sugar or other sweetening matter).
- 2009.90.20.00 Vegetable (under: Mixtures of juices) (liters): General 0.2¢/liter; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4¢/liter.
- 2009.90.40 Other (under: Mixtures of juices): General 7.4¢/liter; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2009.90.40.20 Certified organic (under: Other) (liters).
- 2009.90.40.40 Other (under: Other) (liters).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.