HTS Heading 2304
Oilcake and other solid residues, whether or not ground or in the form of pellets, resulting from the extraction of soybean oil
All 2 HTS codes under heading 2304 (oilcake and other solid residues), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 2304
- 2304.00.00 Oilcake and other solid residues, whether or not ground or in the form of pellets, resulting from the extraction of soybean oil: General 0.45¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 0.7¢/kg.
- 2304.00.00.10 Certified organic (under: Oilcake and other solid residues, whether or not ground or in the form of pellets, resulting from the extraction of soybean oil) (kg).
- 2304.00.00.90 Other (under: Oilcake and other solid residues, whether or not ground or in the form of pellets, resulting from the extraction of soybean oil) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.