HTS Heading 2303
Residues of starch manufacture and similar residues, beet-pulp, bagasse and other waste of sugar manufacture, brewing or distilling dregs and waste, whether or not in the form of pellets
All 6 HTS codes under heading 2303 (residues of starch manufacture), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.4%.
Every line of heading 2303
- 2303 Residues of starch manufacture and similar residues, beet-pulp, bagasse and other waste of sugar manufacture, brewing or distilling dregs and waste, whether or not in the form of pellets.
- 2303.10.00 Residues of starch manufacture and similar residues: General 1.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.
- 2303.10.00.10 Corn gluten feed (under: Residues of starch manufacture and similar residues) (t).
- 2303.10.00.20 Corn gluten meal (under: Residues of starch manufacture and similar residues) (t).
- 2303.10.00.40 Other (under: Residues of starch manufacture and similar residues) (t).
- 2303.20.00 Beet-pulp, bagasse and other waste of sugar manufacture: General Free; Special none; Column 2 $4.91/t.
- 2303.20.00.20 Dried beet-pulp (under: Beet-pulp, bagasse and other waste of sugar manufacture) (t).
- 2303.20.00.40 Other (under: Beet-pulp, bagasse and other waste of sugar manufacture) (t).
- 2303.30.00.00 Brewing or distilling dregs and waste (t): General Free; Special none; Column 2 $4.91/t.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.