HTS Heading 2505
Natural sands of all kinds, whether or not colored, other than metalbearing sands of chapter 26
All 3 HTS codes under heading 2505 (natural sands of all kinds, whether or not colored), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2505
- 2505 Natural sands of all kinds, whether or not colored, other than metalbearing sands of chapter 26.
- 2505.10 Silica sands and quartz sands.
- 2505.10.10.00 Sand containing by weight 95 percent or more of silica and not more than 0.6 percent of oxide of iron (t): General Free; Special none; Column 2 $1.97/t.
- 2505.10.50.00 Other (under: Silica sands and quartz sands) (t): General Free; Special none; Column 2 Free.
- 2505.90.00.00 Other (under: Natural sands of all kinds, whether or not colored, other than metalbearing sands of chapter 26) (t): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.