HTS Heading 2506
Quartz (other than natural sands); quartzite, whether or not roughly trimmed or merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape
All 4 HTS codes under heading 2506 (quartz (other than natural sands)), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2506
- 2506 Quartz (other than natural sands); quartzite, whether or not roughly trimmed or merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape.
- 2506.10.00 Quartz (under: Quartz (other than natural sands); quartzite, whether or not roughly trimmed or merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape): General Free; Special none; Column 2 Free.
- 2506.10.00.10 Sands (other than natural) containing by weight 95 percent or more of silica and not more than 0.6 percent of oxide of iron (t).
- 2506.10.00.50 Other (under: Quartz) (t).
- 2506.20.00 Quartzite (under: Quartz (other than natural sands); quartzite, whether or not roughly trimmed or merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape): General Free; Special none; Column 2 Free.
- 2506.20.00.10 Crude or roughly trimmed (under: Quartzite) (t).
- 2506.20.00.80 Other (under: Quartzite) (t).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.