HTS Heading 2515
Marble, travertine and other calcareous monumental or building stone of an apparent specific gravity of 2.5 or more, and alabaster, whether or not roughly trimmed or merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape
All 4 HTS codes under heading 2515 (marble), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.
Every line of heading 2515
- 2515 Marble, travertine and other calcareous monumental or building stone of an apparent specific gravity of 2.5 or more, and alabaster, whether or not roughly trimmed or merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape.
- 2515.11.00.00 Crude or roughly trimmed (under: Marble and travertine) (m3, t): General Free; Special none; Column 2 $22.95/m3.
- 2515.12 Merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape.
- 2515.12.10.00 Marble (under: Merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape) (t): General Free; Special none; Column 2 13%.
- 2515.12.20.00 Travertine (under: Merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape) (t): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 2515.20.00.00 Other calcareous monumental or building stone; alabaster (t): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.