HTS Heading 2516
Granite, porphyry, basalt, sandstone and other monumental or building stone, whether or not roughly trimmed or merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape
All 7 HTS codes under heading 2516 (granite, porphyry, basalt), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.
Every line of heading 2516
- 2516 Granite, porphyry, basalt, sandstone and other monumental or building stone, whether or not roughly trimmed or merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape.
- 2516.11.00.00 Crude or roughly trimmed (under: Granite) (m3, t): General Free; Special none; Column 2 $8.83/m3.
- 2516.12.00 Merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape: General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 2516.12.00.30 Having a thickness of 7.5 cm or more (t).
- 2516.12.00.60 Other (under: Merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape) (t).
- 2516.20 Sandstone (under: Granite, porphyry, basalt, sandstone and other monumental or building stone, whether or not roughly trimmed or merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape).
- 2516.20.10.00 Crude or roughly trimmed (under: Sandstone) (m3, t): General Free; Special none; Column 2 $5.30/m3.
- 2516.20.20.00 Merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape (t): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 2516.90.00 Other monumental or building stone: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 2516.90.00.30 Having a thickness of 7.5 cm or more (t).
- 2516.90.00.60 Other (under: Other monumental or building stone) (t).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.