HTS Heading 2517

Pebbles, gravel, broken or crushed stone, of a kind commonly used for concrete aggregates, for road metalling, or for railway or other ballast; shingle and flint, whether or not heat-treated; macadam of slag, dross or similar industrial waste, whether or not incorporating the materials cited in the first part of the heading; tarred macadam; granules, chippings and powder, of stones of heading 2515 or 2516, whether or not heat-treated

All 7 HTS codes under heading 2517 (pebbles, gravel, broken or crushed stone), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2517

  • 2517 Pebbles, gravel, broken or crushed stone, of a kind commonly used for concrete aggregates, for road metalling, or for railway or other ballast; shingle and flint, whether or not heat-treated; macadam of slag, dross or similar industrial waste, whether or not incorporating the materials cited in the first part of the heading; tarred macadam; granules, chippings and powder, of stones of heading 2515 or 2516, whether or not heat-treated.
  • 2517.10.00 Pebbles, gravel, broken or crushed stone, of a kind commonly used for concrete aggregates, for road metalling, or for railway or other ballast, shingle and flint, whether or not heat-treated: General Free; Special none; Column 2 30%.
  • 2517.10.00.15 Pebbles and gravel (under: Pebbles, gravel, broken or crushed stone, of a kind commonly used for concrete aggregates, for road metalling, or for railway or other ballast, shingle and flint, whether or not heat-treated) (t).
  • 2517.10.00.20 Limestone, except pebbles and gravel (t).
  • 2517.10.00.55 Other (under: Pebbles, gravel, broken or crushed stone, of a kind commonly used for concrete aggregates, for road metalling, or for railway or other ballast, shingle and flint, whether or not heat-treated) (t).
  • 2517.20.00.00 Macadam of slag, dross or similar industrial waste, whether or not incorporating the materials cited in subheading 2517.10 (t): General Free; Special none; Column 2 30%.
  • 2517.30.00.00 Tarred macadam (under: Pebbles, gravel, broken or crushed stone, of a kind commonly used for concrete aggregates, for road metalling, or for railway or other ballast; shingle and flint, whether or not heat-treated; macadam of slag, dross or similar industrial waste, whether or not incorporating the materials cited in the first part of the heading; tarred macadam; granules, chippings and powder, of stones of heading 2515 or 2516, whether or not heat-treated) (t): General Free; Special none; Column 2 30%.
  • 2517.41.00.00 Of marble (under: Granules, chippings and powder, of stones of heading 2515 or 2516, whether or not heat-treated) (t): General Free; Special none; Column 2 30%.
  • 2517.49.00.00 Other (under: Granules, chippings and powder, of stones of heading 2515 or 2516, whether or not heat-treated) (t): General Free; Special none; Column 2 $1.10/t.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.