HTS Heading 2519

Natural magnesium carbonate (magnesite); fused magnesia; dead-burned (sintered) magnesia, whether or not containing small quantities of other oxides added before sintering; other magnesium oxide, whether or not pure

All 4 HTS codes under heading 2519 (natural magnesium carbonate (magnesite)), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2519

  • 2519 Natural magnesium carbonate (magnesite); fused magnesia; dead-burned (sintered) magnesia, whether or not containing small quantities of other oxides added before sintering; other magnesium oxide, whether or not pure.
  • 2519.10.00.00 Natural magnesium carbonate (magnesite) (t): General Free; Special none; Column 2 $10.33/t.
  • 2519.90 Other (under: Natural magnesium carbonate (magnesite); fused magnesia; dead-burned (sintered) magnesia, whether or not containing small quantities of other oxides added before sintering; other magnesium oxide, whether or not pure).
  • 2519.90.10.00 Fused magnesia and dead-burned (sintered) magnesia (kg): General Free; Special none; Column 2 1.7¢/kg.
  • 2519.90.20.00 Caustic calcined magnesite (under: Other) (t): General Free; Special none; Column 2 $20.70/t.
  • 2519.90.50.00 Other (under: Other) (kg): General Free; Special none; Column 2 15.4¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.