HTS Heading 2520

Gypsum; anhydrite; plasters (consisting of calcined gypsum or calcium sulfate) whether or not colored, with or without small quantities of accelerators or retarders

All 2 HTS codes under heading 2520 (gypsum), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2520

  • 2520 Gypsum; anhydrite; plasters (consisting of calcined gypsum or calcium sulfate) whether or not colored, with or without small quantities of accelerators or retarders.
  • 2520.10.00.00 Gypsum; anhydrite (under: Gypsum; anhydrite; plasters (consisting of calcined gypsum or calcium sulfate) whether or not colored, with or without small quantities of accelerators or retarders) (t): General Free; Special none; Column 2 Free.
  • 2520.20.00.00 Plasters (under: Gypsum; anhydrite; plasters (consisting of calcined gypsum or calcium sulfate) whether or not colored, with or without small quantities of accelerators or retarders) (t): General Free; Special none; Column 2 $1.38/t.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.