HTS Heading 2523
Portland cement, aluminous cement, slag cement, supersulfate cement and similar hydraulic cements, whether or not colored or in the form of clinkers
All 5 HTS codes under heading 2523 (portland cement, aluminous cement, slag cement), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2523
- 2523 Portland cement, aluminous cement, slag cement, supersulfate cement and similar hydraulic cements, whether or not colored or in the form of clinkers.
- 2523.10.00.00 Cement clinkers (under: Portland cement, aluminous cement, slag cement, supersulfate cement and similar hydraulic cements, whether or not colored or in the form of clinkers) (t): General Free; Special none; Column 2 $1.32/t, including weight of container.
- 2523.21.00.00 White cement, whether or not artificially colored (t): General Free; Special none; Column 2 $1.76/t, including weight of container.
- 2523.29.00.00 Other (under: Portland cement) (t): General Free; Special none; Column 2 $1.32/t, including weight of container.
- 2523.30.00.00 Aluminous cement (under: Portland cement, aluminous cement, slag cement, supersulfate cement and similar hydraulic cements, whether or not colored or in the form of clinkers) (t): General Free; Special none; Column 2 $1.32/t, including weight of container.
- 2523.90.00.00 Other hydraulic cements (under: Portland cement, aluminous cement, slag cement, supersulfate cement and similar hydraulic cements, whether or not colored or in the form of clinkers) (t): General Free; Special none; Column 2 $1.32/t, including weight of container.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.