HTS Heading 2524
Asbestos
All 7 HTS codes under heading 2524 (asbestos), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2524
- 2524 Asbestos.
- 2524.10.00.00 Crocidolite (Blue) (under: Asbestos) (t): General Free; Special none; Column 2 Free.
- 2524.90.00 Other (under: Asbestos): General Free; Special none; Column 2 Free.
- 2524.90.00.10 Amosite (under: Other) (t).
- 2524.90.00.30 Crudes (under: Chrysotile) (t).
- 2524.90.00.40 Milled fibers, group 3 grades (spinning fibers or equivalent) (t).
- 2524.90.00.45 Milled fibers, group 4 and 5 grades (t).
- 2524.90.00.55 Other (under: Chrysotile) (t).
- 2524.90.00.60 Other (under: Other) (t).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.