HTS Heading 2525
Mica, including splittings; mica waste
All 5 HTS codes under heading 2525 (mica, including splittings), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2525
- 2525 Mica, including splittings; mica waste.
- 2525.10.00 Crude mica and mica rifted into sheets or splittings: General Free; Special none; Column 2 Free.
- 2525.10.00.10 Split block mica (under: Crude mica and mica rifted into sheets or splittings) (kg).
- 2525.10.00.20 Mica splittings (under: Crude mica and mica rifted into sheets or splittings) (kg).
- 2525.10.00.50 Other (under: Crude mica and mica rifted into sheets or splittings) (kg).
- 2525.20.00.00 Mica powder (under: Mica, including splittings; mica waste) (kg): General Free; Special none; Column 2 20%.
- 2525.30.00.00 Mica waste (under: Mica, including splittings; mica waste) (kg): General Free; Special none; Column 2 8.8¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.