HTS Heading 2530

Mineral substances not elsewhere specified or included

All 8 HTS codes under heading 2530 (mineral substances not elsewhere), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.9%.

Every line of heading 2530

  • 2530 Mineral substances not elsewhere specified or included.
  • 2530.10.00.00 Vermiculite, perlite and chlorites, unexpanded (kg): General Free; Special none; Column 2 Free.
  • 2530.20 Kieserite, epsom salts (natural magnesium sulfates).
  • 2530.20.10.00 Kieserite (under: Kieserite, epsom salts (natural magnesium sulfates)) (kg): General Free; Special none; Column 2 Free.
  • 2530.20.20.00 Epsom salts (under: Kieserite, epsom salts (natural magnesium sulfates)) (kg): General Free; Special none; Column 2 20%.
  • 2530.90 Other (under: Mineral substances not elsewhere specified or included).
  • 2530.90.10.00 Natural cryolite; natural chiolite (t): General Free; Special none; Column 2 Free.
  • 2530.90.20.00 Natural micaceous iron oxides (kg): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2530.90.80 Other (under: Other): General Free; Special none; Column 2 0.3¢/kg.
  • 2530.90.80.10 Celestite (under: Other) (kg).
  • 2530.90.80.15 Earth colors (under: Other) (kg).
  • 2530.90.80.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.