HTS Heading 2601

Iron ores and concentrates, including roasted iron pyrites

All 7 HTS codes under heading 2601 (iron ores and concentrates), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2601

  • 2601 Iron ores and concentrates, including roasted iron pyrites.
  • 2601.11.00 Non-agglomerated (under: Iron ores and concentrates, other than roasted iron pyrites): General Free; Special none; Column 2 Free.
  • 2601.11.00.30 Concentrates (under: Non-agglomerated) (t).
  • 2601.11.00.60 Coarse (under: Ores) (t).
  • 2601.11.00.90 Other (under: Ores) (t).
  • 2601.12.00 Agglomerated (under: Iron ores and concentrates, other than roasted iron pyrites): General Free; Special none; Column 2 Free.
  • 2601.12.00.30 Pellets (under: Agglomerated) (t).
  • 2601.12.00.60 Briquettes (under: Agglomerated) (t).
  • 2601.12.00.90 Other (under: Agglomerated) (t).
  • 2601.20.00.00 Roasted iron pyrites (under: Iron ores and concentrates, including roasted iron pyrites) (t): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.