HTS Heading 2603

Copper ores and concentrates

All 5 HTS codes under heading 2603 (copper ores and concentrates), with their duty rates from the 2026 HTS Revision 23.

Every line of heading 2603

  • 2603.00.00 Copper ores and concentrates: General 1.7¢/kg on lead content; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.8¢/kg on copper content + 3.3¢/kg on lead content + 3.7¢/kg on zinc content.
  • 2603.00.00.10 Copper content (under: Copper ores and concentrates) (Cu kg).
  • 2603.00.00.20 Lead content (under: Copper ores and concentrates) (Pb kg).
  • 2603.00.00.30 Zinc content (under: Copper ores and concentrates) (Zn kg).
  • 2603.00.00.40 Silver content (under: Copper ores and concentrates) (Ag g).
  • 2603.00.00.50 Gold content (under: Copper ores and concentrates) (Au g).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.