HTS Heading 2602
Manganese ores and concentrates, including ferruginous manganese ores and concentrates with a manganese content of 20 percent or more, calculated on the dry weight
All 2 HTS codes under heading 2602 (manganese ores and concentrates), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2602
- 2602.00.00 Manganese ores and concentrates, including ferruginous manganese ores and concentrates with a manganese content of 20 percent or more, calculated on the dry weight: General Free; Special none; Column 2 2.2¢/kg on manganese content.
- 2602.00.00.40 Containing less than 47 percent by weight of manganese (kg, Mn kg).
- 2602.00.00.60 Containing 47 percent or more by weight of manganese (kg, Mn kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.